The Horizon4 Power Plant location is between the two locations of MOORHEAD WIND FARM and ASTMOOH on the map.
The Moorhead Wind Farm icon is a speedometer. The location of the Moorhead Wind Farm is a speed test challenge. The 1-star challenge must reach 96.6 km/h, the 2-star challenge must reach 241.4 km/h, and the 3-star challenge must reach 386.2 km/h. H.
Other check-in points
Moorhead Wind Power Station: There are many huge wind turbines and large lavender fields in the summer.
The Cherry Blossom Forest outside Edinburgh: You can check in here during the Spring Split, or select 'Create a plan' in single player and customize the current season, weather and the specific time in the event settings. Wait, then start the race and head to the filming location. This way you can takehe photos with cherry blossoms in seasons other than spring.
The importance of this wind measuring tower for wind energy forecasting is as follows:
The wind measuring tower Wind measurement of wind farm plays a very important role in wind power forecasting. The function of the anemometer tower is to provide data for the operation of wind turbines by measuring the wind speed and direction of the wind farm, and then predict the power output of the wind farm. Analyze historical data, establish a wind power forecast model, and use the current wind speed and other related parameters to predict the future power output of the wind farm.