The average annual electricity output of Wudongde Dam can meet one-third of Guangzhou's annual electricity demand.
Wudongde Hydropower Station is located on the main stem of the Jinsha River, at the junction of Luquan County in Yunnan Province and Huidong County in Sichuan Province. This is a major national project to implement this project. “West to east electricity transmission” and corresponds to the lower reaches of the Jinsha River. The most upstream level of the four cascade power stations (Wudongde, Baihetan, Xiluodu and Xiangjiaba) is a giant hydropower station that has entered the ranks of dozens. millions of kilowatts.
The construction of Wudongde hydropower station should respect ecological priority and green development, promote the development of Jinsha River water energy resources ofscientific and orderly manner, promote the development and protection of the Jinsha River basin for the sake of protection. , and better benefit people.
Chinese craftsmanship creates the “best” in the world.
The Wudongde Hydropower Station Dam is 270 meters high, with a thickness-to-height ratio of only 0.19. Since the construction of the power plant began, Yangtze River designers have overcome a series of global technical problems and created 8 "world firsts", 15 "industrial firsts" and 8 "technology breakthroughs". hydroelectric engineering”.
Wudongde Hydropower Station has established many "best" in the world, which is inseparable from the many new technologies used in its construction. Wudongde Dam has overcome the persistent problem of “no dam will crack” in hydropower dams nationwideand abroad, and can be called a "seamless dam" in the true sense of the word.