Qingjiang Hydropower's water abandonment refers to the amount of water that cannot be used for various reasons in a year.
These data are generally used to evaluate the efficiency of the use of water resources and the operation of hydroelectric power plants. The reasons why Qingjiang hydropower abandons water include:
1. Natural conditions: for example, the influx of water during the flood season is too great and the reservoir cannot accommodate it, or the influx of water during the dry season is too great. too small and the demand for electricity production cannot be met.
2. Changes in power system demand: Power system demand will change at different time periods. If electricity production does not match actual demand, this will result in water being abandoned.
3. Maintenance and overhaul of equipmentents: Hydroelectric power plant equipment requires regular maintenance and overhaul. During this period, electricity production will stop, resulting in water loss.