After the installation is completed or during operation, when the steam turbine is out of service for a long time, the following measures should be taken to prevent corrosion of the components of the steam turbine installation: < /p>
1. Every 15 days, start the lubricating oil pump, lifting oil pump, generator sealing oil pump and generator sealing oil pump at least once. oil pump of the regulating system, and run the starting device for 15 minutes
2. Every 15 days At least once, start the oil pump of the regulating system and turn on and off all the oil motors of the steam turbine steam distribution system p>
; p>
3. If the steam turbine is out of service for more than 10 days, a procedure should be implemented to prevent the formation and accumulation of moisture in the steam turbine device and part crossturbine health
<; p>4. When the steam turbine is in the starting state for a long time, the adjustment should be started at least once per shift. The system's electric oil pump will adjust the speed for 15 minutes