Hydroelectric power station:
1. It does not have to be a steep cliff and the terrain must be suitable for the development of hydraulic works as well as interception and diversion.
2. There must be a relatively large gap and a certain amount of work to achieve a relatively large storage capacity.
3. The relocation of immigrants to the submerged area of the reservoir and the resulting benefits should be reasonable.
4. The geological structure is stable, does not cause geological disasters, and avoids reservoir leakage.
5. Have better transportation conditions as much as possible.
6. Do not cause new environmental problems.
7. Conducive to local economic development.
What about wind power generation
I'm not sure
It probably requires a certain wind speed
The speed ofwind is 3 -20 m/s Left and right
The most important condition for the construction of the reservoir must be the geological conditions
First of all, a study and Preliminary investigation of the reservoir area and dam site should be carried out. Generally, the geology of the reservoir area should be capable of meeting the water requirements, such as sufficient storage capacity, presence of large caves and large unstable rock masses in the reservoir area, and minimizing immigration. the dam site must take into account the geology, relief, construction sites, etc.
As for the geological conditions suitable for the construction of the reservoir project, if it is a reservoir area, the rock mass of the reservoir area should be relatively stable and there should not be any have significant defects affecting water storage. If it is a dam site, it is up to youe repair.
As for the port, I really can't help you
You can find it yourself