Too little rain. The Xin'anjiang hydropower station is difficult to generate electricity because the water level is too low. The province's installed hydroelectric capacity of 4 million kilowatts is basically stuck in the dilemma of producing electricity without water. The Xin'anjiang hydropower station is unable to generate electricity due to lack of rain. The Xin'anjiang Hydropower Station not only invested a lot of manpower and material resources, but also submerged so many ancient cities. The most important thing is that they believe that the benefits it will bring will be greater than those of these “victims”. After the completion of the Xin'anjiang Hydropower Station, it indeed played a small role. For example, multiple floods and flood spills have protected hundreds of thousands of acres downstream from disasters, and water and electricity suppliesricity of surrounding towns was also interrupted. Greatly improved.
Yes. According to Sichuan hydropower policy surveys, it can be seen that Sichuan's hydropower consumption will be canceled. Hydropower consumption is the digestion and absorption of hydropower. Since power plants produce electricity and then send it to the grid, electrical energy cannot be conveniently stored and is wasted if not used. Therefore, excess electrical energy must be routed to load points with electrical energy demand.