Answer:
Requirements for the construction of a hydroelectric power station:
1. There is a water source, and the water source must have sufficient flow and height.
2. Have sufficient funds to purchase equipment, construction materials, pay salaries of design and construction personnel and other related expenses.
3. Have sufficient technical strength and technical construction strength.
4. I'm afraid this still requires approval from relevant departments.