1. First, get a preliminary understanding of the water resources situation and the local electric transmission situation. After obtaining the preliminary determination, apply to the National Development and Reform Commission or the Economic and Trade Bureau to make a preliminary assessment. investment plan.
2. Second, preliminary study and design, preliminary feasibility report.
3. Finally, follow the formalities, design formally and build according to the design document.
Yes! First, you need to register a business. Then there are 21 procedures including project establishment, initial design, feasibility study, environmental impact assessment, immigration, water conservation, internet access and electricity prices. Once all preparations are complete, we will receive a departure order. Procedures for grandes, small and micro businesses are the same, but the level of approval is different. As long as water resources are good! If the benefits are good, don't be afraid of trouble.