Driven by the current increasing energy demand and environmental awareness, photovoltaic power generation, as one of the important forms of clean energy, has received more and more attention. attention and application. Among them, the photovoltaic shed is a common photovoltaic power generation facility which combines the solar photovoltaic power generation system with a modern parking shed to achieve double benefits. However, to successfully build a photovoltaic carport, you must follow a series of procedures and obtain access procedures to ensure project compliance and safety.
Building a photovoltaic carport requires the following process:
1. Complete the photovoltaic power generation installation application documents: Go to the local power supply office and complete the photovoltaic power installation formoduction of photovoltaic energy. application form, including installed capacity and other relevant information.
2. On-site investigation and understanding of the situation: The Power Supply Bureau will arrange personnel to conduct an on-site investigation to understand the location of the carport, site conditions, lighting conditions, etc. . and assess the feasibility of photovoltaic energy production.
3. Provide grid connection plan: Based on on-site conditions, the Power Supply Bureau will provide a grid connection plan, including design requirements, access methods, grid connection points and other information of the photovoltaic energy production system.
4. Grid-connected construction: According to the grid connection plan provided by the Power Supply Bureau, the grid-connected construction of the photovoltaic shelter will be rcarried out in accordance with regulations, including the installation of photovoltaic panels, inverters and other equipment, and realization of the connection to the network. Debugging and connection.
5. Complete the Grid Connection Acceptance Request Form: Once construction is complete, complete the Grid Connection Acceptance Request Form. The Power Supply Bureau will replace the original meter with a bidirectional meter and proceed to accept the grid connection.
The above are the procedures and processes required for the construction of a photovoltaic shelter. It should be noted that the approval process varies by region. During the construction process, operations should be carried out in accordance with relevant laws and regulations and the requirements of the Power Supply Bureau, and safety grounding should be ensured to ensure proper construction.rolling. of the project.
In short, building a photovoltaic shelter is a complex and interesting project that can not only meet parking needs but also solve energy problems. Through proper operation and compliant construction, photovoltaic shelters will bring sustainable development and green energy use to society, providing cleaner and renewable energy solutions for the future.