Whether top floor residents have the right to prevent others from building on the roof is mainly judged based on the following two situations:
1. If the design of the house meets the conditions for installing solar water heaters, the owner on the top floor does not have the right to prevent other people from doing so. Installed by the owner. If the design of the house itself does not meet the conditions, no one can install it without permission or risk damaging it. floor structure;
2. If the public parts of the building are owned by all owners, the owners have the right to. If a water heater is installed on the roof, consent from residents on the top floor must be obtained. be obtained. If the top floor residents do not agree, both parties can resolve the issue by signing an agreement. If this is specified in the agreementte, if the roof leaks due to the installation of the water heater, the resident who installed the water heater can do so. bear part of the repair costs.
The inspection methods to participate in safe production and civilized construction at the construction site mainly include routine inspections, special inspections and joint inspections. The specific explanations are as follows:
1. Routine inspections refer to the organization of the project manager. Daily inspections or regular spot inspections organized by the construction company, the supervising engineer should participate in these self-inspection activities, review and sign the activity records, and supervise the rectification
2 ; Special inspections should be carried out in accordance with the civilized construction management issued by the municipal construction committee. Neck documentsverate issues such as mud and soil excavation, sanitation and epidemic prevention. Inspections on management documents, publicity and education, etc., as well as special inspections carried out in accordance with relevant documents of higher departments or inspections on key projects and parts;
3. Joint inspections refer to supervision. group inspection in accordance with the “Construction Safety Inspection Standards” Inspections are carried out in three stages during the construction process (i.e. the foundation, the main structure and three stages before the completion of the project). The rating results are signed by the project manager or the responsible person on site of the construction company and the responsible person of the supervision company, and serve as the main basis for evaluating the safety level of the construction a times the projectfinished.
The frequency of inspections is as follows:
1. Routine inspections, safety inspections for companies at least once a quarter and for project departments at least once a month. Civilized construction inspection companies should carry out regular spot inspections at least once a quarter, and the project department at least once a week
2. Special inspections should be determined flexibly based on actual conditions; project
3. Joint inspection, at least once at each stage.
Article 286 of the Civil Code of the People's Republic of China: Owners shall comply with laws, regulations and management protocols, and relevant behaviors shall conform to the requirements of resource conservation and land protection. ecological environment. So that real estate service companies or other gAuthorities implement emergency response measures and other management measures implemented by the government in accordance with the law, owners must cooperate in accordance with the law.
The owners' assembly or the owners' committee has the right to act in accordance with the law against any behavior that infringes on the legitimate rights and interests of others, such as arbitrarily littering, issuing pollutants or noise, lifting animals in violation of regulations, illegal construction, encroachment on crossings, refusal to pay property rights, etc. Laws, regulations, and management protocols require perpetrators to stop violations, remove obstacles, eliminate hazards, restore the original status quo, and compensate for losses.
If the owner or another actor refuses to fulfill the relevant obligations, the parties concerned may report or file a complaintte to the relevant administrative departments, and the relevant administrative departments will handle the problem in accordance with the law.