The company built a power plant on the seashore. As it is built close to the mudflats and state-owned coal bases, it has the advantage of rational and efficient use of land, fuel and seawater resources. Seawater cooling is used to generate electricity, and the fresh water used in the electricity generation process is obtained using the technology desalination of sea water by reverse osmosis. At the same time, new technologies such as wet desulfurization, high-efficiency electrostatic precipitator, low nitrogen burner, dry ash removal and comprehensive utilization of water resources are adopted, and all emissions meet the requirements of national environmental protection monitoring indicators. The power plant has 2 circuits with a voltage level of 500 kV et is connected to the Beijing-Tianjin-Tangshan power grid via the Angezhuang 500 kV substation.
Units No. 1 and No. 2 successfully completed the 168-hour full load test operation on December 7 and 28, 2005, respectively. Once commissioned and producing electricity, the unit not only supports the electricity supply in the eastern part of the power grid, but also helps alleviate the regional electricity shortage.