Rudila Hydroelectric Power Station mainly produces electricity, but also performs comprehensive use functions such as soil and water conservation, maritime transportation in the reservoir area and tourism . According to the design results of the pre-feasibility study, the normal water storage level of the plant is 1,223 m, with a total storage capacity of 1.718 billion cubic meters. It is equipped with 6 units of 360 MW, with a total installed capacity of. 2160 MW, an average electricity production over several years of 9.957 billion kWh and an annual hour of use of 4610h I and other large projects of type (1). The engineering center buildings are mainly composed of roller compacted concrete gravity dams, surface holes and bottom holes of river bed overflow, diversion tunnels, right bank underground power plants and ofswitching stations and other buildings.
1800 meters. According to the Baidu Map query, Ludila Hydropower Station is located on the middle reaches of the main stream of Jinsha River, at the junction of Binchuan County, Dali Bai Autonomous Prefecture, Yunnan Province and Jinsha County. Yongsheng, from Lijiang City. "eight levels of a reservoir" in the hydropower plan of the main course of the Jinsha River. The eighth-level hydropower station, with an altitude of 1,800 meters, has a total installed capacity of 2.16 million kilowatts and an annual electricity output of 9.67 billion kilowatt hours. It is one of the largest hydroelectric power stations in the middle reaches of the Jinsha River.