Let's take as an example the conditions for complete start-up of a thermal power plant:
1. Strengthen the organization and management of production preparations and improve the organizational structure
2. Improve technical management, compile various procedures and system drawings
3. Strengthen staff training and obtain certificates, and actively participate in branch trial operations
4. production requirements and the actual situation of on-site operation and debugging, make adequate on-site preparations