To carry out a photovoltaic project, you must go through a series of procedures such as project submission, land use and building permit, environmental impact assessment and approval, authorization for access to electricity and connection to the network, security and construction authorization, etc.
1. Project registration and site selection
First of all, investors in photovoltaic projects need to submit an application for project registration to the local Development and Reform Commission or the Energy Bureau , including the basic project. information, technical plans and scale of investment, etc. At the same time, site selection is also a key step and factors such as land properties, lighting conditions and environmental impacts should be considered.
2. Land use and building permit
Once the selection of the ifIf determined, it is necessary to apply for a land use permit from the land department to ensure that the project land complies with the overall land use plan. At the same time, it is necessary to request a building permit from the urban and rural planning department to ensure that the project complies with the urban or rural development plan.
3. Environmental impact assessment and approval
Photovoltaic projects must conduct an environmental impact assessment to evaluate the potential impact of the project on the environment and formulate corresponding environmental protection measures . After the environmental impact assessment report is completed, it must be submitted to the environmental protection department for approval to ensure that the project meets environmental protection requirements.
4. Authorization for access to electricity and connectionto the grid
Photovoltaic projects must be connected to the electricity network, they must therefore request authorizations for access to electricity and connection to the network from the electricity department. This includes negotiating the access plan with the power grid company and signing a grid connection agreement to ensure that the project can smoothly connect to the grid and realize power generation.
5. Safety and construction permit
Before starting the project, you must apply for a construction safety permit from the production safety supervision and management department to ensure safety during the construction process. construction. At the same time, it is necessary to apply for a building permit from the construction department to ensure that the construction of the project complies with relevant laws and regulations.
6. Reception and production of electricity cconnected to the grid
Once the project is completed, acceptance work must be carried out to ensure that the quality of the project meets the design requirements. After passing the acceptance inspection, the project can be officially connected to the grid to generate electricity and provide clean energy to the local area.
In summary:
To carry out photovoltaic projects, you must go through project submission, land use and building permit, evaluation and approval environmental impact, access to electricity and authorization to connect to the network, security. and construction licenses and other procedures. Carrying out these procedures guarantees the compliance, safety and environmental protection of the photovoltaic project, and guarantees the smooth running of the project and electricity production.
Legal basis:
"Renewable Energy Law of the People's Republiclaire of China"
Article 14 stipulates:
The State shall implement the renewable energy fully guaranteed purchasing system for energy production.
State grid companies and electricity dispatch agencies shall, in accordance with the requirements of the fully guaranteed acquisition system, sign grid connection agreements with renewable energy generation companies and fully acquire grid-connected power plants within their network coverage that meets grid-connected technical standards Grid-connected renewable energy generation projects. are required to cooperate with power grid companies to ensure grid security
"Electricity Law of the People's Republic of China"
Article 25 states:
SupplyCompanies and usersElectricity must comply with national regulations in force, obey the unified distribution of the electricity network and strictly respect the quotas for electricity supply and consumption.
It is entirely possible to build photovoltaic power plants on arid mountains. Those that have been built so far can not only be built on barren mountains, but also on lakes and rivers; connected to the agricultural system. The cases that have been constructed include photovoltaic agricultural greenhouses and complementary photovoltaic power generation systems that significantly increase the space utilization area of land and other resources. Photovoltaic power plants are generally installed in relatively flat locations or. on flat roofs