1. The mountainous area should be a sunny slope
2. The effective sunny slope area of the mountainous area is more than 1,000 acres and is within 3 kilometers of the substation. substation access conditions are good, more than 600 acres is also acceptable.
3. The slope of the mountain is small
4 The nature of the terrain should be wasteland, barren mountains, and the terrain type is determined by the Land and Resources Bureau
3. p>
5. The forestry bureau determines that this is not forest land
6 Are there any substations within 10 kilometers?
7 What is the size of 35KV substation? 110KV or 220KV?
8. What is the remaining capacity of the substation? How many main transformer units are there? Can capacity be increased?
9. Is the local government supportive (consultation with the Local Development Commission)development and reform)
10. Terrain, traffic situation on the mountain
11. It is best to pay the land rent annually. Ask about the rental price. If the price is low, the payment term can be extended appropriately.
12. The general lease term is 25-30 years.
If you occupy farmers' land to install photovoltaic power generation, you need to pay money, otherwise the farmers will not be able to 'agreement. what is the amount of the subsidy per mu? Different regions have different subsidy standards. Currently, when installing photovoltaic power generation, it is not allowed to occupy cultivated land. Planning for photovoltaic energy production must be in accordance with the overall land use plan and other relevant plans. If unused land can be used, agricultural land does noti can't be busy; bad land can be used, good land must not be occupied. It is prohibited to occupy permanent basic agricultural land in any way.
This also confirms that in general, the land that can be occupied for photovoltaic energy production is relatively poor and that the subsidies granted will naturally be lower. In addition, the land currently occupied by photovoltaic installations is generally leased, and the land will not be directly acquired. After all, the appearance of the land will not be changed, and it can later be transformed into cultivated land. Therefore, the subsidy money mainly goes towards rent.
The current rent per acre of land in some areas is around 450 yuan. This standard is completely acceptable. After all, it's just bad land, most of which is abandonednted and used. photovoltaic energy production. The best thing is that you can also get rent, which is more expensive than renting good land to others for farming. Therefore, if an employer rents photovoltaic energy production, it can be rented if the price is right.