What are the installation and construction specifications of diesel generator sets?

Introduction What are the installation and construction specifications of diesel generator sets? What are the installation specifications of diesel generator sets? 1. Preparations before installing the unit: 1. Transporting the unit, pay attention to the lifting cable

What are the installation and construction specifications of diesel generator sets?

Diesel generator set installation specifications

1. Preparations before installing the unit:

1. Transportation of the unit;

Particular attention must be given. during transportation The lifting rope should be tied in a suitable position and lifted gently. Once the unit is transported to its destination, it should be stored in a warehouse as much as possible. If there is no warehouse and it must be stored in the open, the fuel tank must be elevated to prevent it from getting soaked. rain. The tank should be covered with a waterproof tent to prevent it from being exposed to sun and rain.

Due to the large size and heavy weight of the unit, the transportation route should be arranged before installation, and a transportation port should be reserved in the engine room. Once the unit is installed, the walls must be arranged. be repaired and the doors and windowsmust be installed.

2. Unpacking;

Before unpacking, you must first remove the dust and check the box for damage. Check the box number and quantity, and do not damage the device when unpacking. The order of unboxing is to fold the top panel first, then remove the side panels. After unpacking, the following work must be carried out:

①. Check all units and accessories according to the unit list and packing list;

② Check if the main dimensions of the unit; and accessories conform to the drawings. ;

③. Check whether the unit and accessories are damaged or rusty

④ If the unit cannot be installed in time after inspection; Disassembled parts must be surface finished. Reapply rust-inhibiting oil for proper protection. Do not rotate the transmission part and lubricating part of the front unitnt having removed the anti-rust oil. If the anti-rust oil was removed after inspection, it must be reapplied after the inspection.

⑤. The unit after unpacking should be carefully stored and placed horizontally. The flange and the various interfaces must be blocked and bandaged to prevent rain and dust from infiltrating.

3. Line positioning;

Delineate the unit installation based on the relationship dimensions between the unit and the center of the wall or column, and between the unit and the marked unit . on the unit floor plan. The vertical and horizontal reference lines of the location. The allowable gap between the center of the unit and the center of the wall or column is 20mm, and the allowable gap between units is 10mm.

4. Check equipment for installation;

Check equipment, understand design content and construction drawings, prepare materialsx required as per design drawings and deliver materials in sequence. according to construction site People.

If there are no design drawings, you should refer to the instructions and determine the size and location of the civil construction plan according to the purpose and requirements of installation of equipment, taking into account the water source, power supply. conditions of supply, maintenance and use, and establish a plan for the implementation of the units.

5. Prepare lifting equipment and installation tools;

2. Installing the unit:

1. Measure the foundation and the vertical and horizontal center lines of. unity;

Before the unit is in place, the vertical and horizontal center lines of the foundation and the unit as well as the positioning line of the shock absorber must be drawn according to the layout drawing ".

2. Raise the unit;

When lifting, a steel cable of sufficient strength should be used at the lifting position of the unit. It should not be placed on the tree. This should also prevent damage to the oil pipe and dial. Lift the unit, align it with the center line of the foundation and shock absorber, then move the unit. Place the pad flat.

3. Level the machine;

Use the horns to level the machine. Installation accuracy is 0.1 mm per meter in horizontal longitudinal and transverse deviations. There should be no gaps between the iron and the base of the machine to ensure uniform stress.

4. Installation of smoke evacuation pipes;

The exposed parts of the smoke evacuation pipes must not be in contact with wood or other flammable substances. The extension of the flue must allow thermal expansion and the flue must eprevent rainwater from entering.

⑴. Horizontal overhead: The advantages are fewer turns and low resistance; the disadvantages are poor heat dissipation indoors and high temperature in the computer room.

⑵. Installation in trenches: the advantage is good heat dissipation inside; the disadvantages are many turns and high resistance.

5. The unit's exhaust pipe has a high temperature. In order to prevent the operator from being burned and to reduce the increase in engine room temperature caused by radiant heat, it must be insulated. Heat-insulating and heat-resistant material can be wrapped with glass wool or aluminum silicate, can play the role of heat insulation and noise reduction.

3. Exhaust system installation:

1. The working definition of diesel generator set exhaust system signifie that after the installation of the diesel generator set, engine room, the exhaust system is discharged by the engine. The air port is connected to the engine room exhaust duct.

2. The diesel generator set exhaust system includes the standard muffler, bellows, flange, elbow, gasket and engine room connected to the exhaust pipe outside the engine room.

The exhaust system should reduce the number of elbows and shorten the overall length of the exhaust pipe as much as possible, otherwise the exhaust pipe pressure of the unit will increase. This will cause the unit to lose excessive power, affecting its normal operation and shortening its normal lifespan. The exhaust pipe diameter specified in the technical data of the diesel generator set is generally based on a total exhaust pipe length of 6 m and the installation of at least 6 m.read an elbow and a silencer. When the exhaust system exceeds the length and number of elbows specified during actual installation, the diameter of the exhaust pipe should be increased appropriately. The extent of the increase depends on the total length of the exhaust pipe and the number of bends. The first section of piping coming from the unit's compressor exhaust manifold must contain a flexible bellows section. The bellows has been supplied to the customer. The second section of the exhaust pipe must be elastically supported to avoid unreasonable installation of the exhaust pipe or additional lateral stresses and strains caused by relative displacement of the exhaust system due to thermal effects when the unit is in operation. functioning. Compressive stress is added to the unit and all support mechanisms and suspension devices of the exhaust pipe must have a certain degree of elasticity. When there is more than one unit in the engine room, remember that the exhaust system for each unit must be designed and installed independently. It is never allowed to allow different units to share an exhaust pipe to avoid abnormal fluctuations caused by different exhaust pressures of different units when the unit is in operation, increase the exhaust pressure and prevent Smoke and exhaust gases flow back through the shared pipe. affecting the normal power output of the unit may even cause damage to the unit.

4. Installation of electrical systems:

1. Cable Laying Methods

Cable laying methods include direct burial, use of cable trenches and laying along walls. Wait a few moments. .

2. Selecting the cable routing path

Choose the cable routing path WhenWhen choosing the diameter, the following principles should be considered:

⑴ The shortest feed path and the fewest turns

⑵ Make the cable least affected by mechanical, chemical and earth constraints; possible current factors.

⑶. The heat dissipation conditions must be good;

⑸. Avoid planned areas where soil must be excavated.

3. General requirements for cable laying

When laying cables, you must comply with the planning and design requirements of the relevant technical regulations.

⑴ If the installation conditions allow it, a margin of 1.5%~2% can be considered for the length of the cable.

What are the main installation requirements for diesel generator sets?

What are the installation requirements for diesel generator sets (Yizhong power station diesel generator set )? install itation of the diesel generator should not be negligent. There are many points to pay attention to:

1. Preparation work before installing the unit:

1. . Transporting the unit;

When transporting, be sure to tie the lifting rope in a suitable position and lift it gently. Once the unit is transported to its destination, it should be stored in a warehouse as much as possible. If there is no warehouse and it must be stored in the open, the fuel tank must be elevated to prevent it from getting soaked. rain. The tank should be covered with a waterproof tent to prevent it from being exposed to sun and rain.

Due to the large size and heavy weight of the unit, the transportation route should be arranged before installation, and a transportation port should be reserved in the engine room. Once the unit is installed, the walls must be arranged. bee repaired and doors and windows must be installed.

2. Unpacking;

Before unpacking, you must first remove the dust and check the box for damage. Check the box number and quantity, and do not damage the device when unpacking. The order of unboxing is to fold the top panel first, then remove the side panels. After unpacking, the following work must be carried out:

①. Check all units and accessories according to the unit list and packing list;

② Check if the main dimensions of the unit; and accessories conform to the drawings. ;

③. Check whether the unit and accessories are damaged or rusty

④ If the unit cannot be installed in time after inspection; Disassembled parts must be surface finished. Reapply rust-inhibiting oil for proper protection. Do not rotate the transmission part andlubricating part of the unit before removing the anti-rust oil. If the anti-rust oil was removed after inspection, it must be reapplied after the inspection.

⑤. The unit after unpacking should be carefully stored and placed horizontally. The flange and the various interfaces must be blocked and bandaged to prevent rain and dust from infiltrating.

3. Line positioning;

Delineate the unit installation based on the relationship dimensions between the unit and the center of the wall or column, and between the unit and the marked unit . on the unit floor plan. The vertical and horizontal reference lines of the location. The allowable gap between the center of the unit and the center of the wall or column is 20mm, and the allowable gap between units is 10mm.

4. Check equipment for installation;

Check equipment, understand design content and drawingse construction, and prepare the required materials according to the design drawings., and deliver the materials to the construction site in order according to the construction.

If there are no design drawings, you should refer to the instructions and determine the size and location of the civil construction plan according to the purpose and requirements of installation of equipment, taking into account the water source, power supply. conditions of supply, maintenance and use, and establish a plan for the implementation of the units.

5. Prepare lifting equipment and installation tools;

2. Installing the unit:

1. Measure the foundation and the vertical and horizontal center lines of. unity;

Before the unit is in place, the vertical and horizontal center lines of the foundation and the unit as well as the positioning line of the shock absorber must be drawn according toto the “layout” design.

2. Raise the unit;

When lifting, a steel cable of sufficient strength should be used at the lifting position of the unit. It should not be placed on the tree. This should also prevent damage to the oil pipe and dial. Lift the unit, align it with the centerline of the foundation and shock absorber, and level the unit.

3. Level the machine;

Use the horns to level the machine. Installation accuracy is 0.1 mm per meter in horizontal longitudinal and transverse deviations. There should be no gaps between the iron and the base of the machine to ensure uniform stress.

4. Installation of smoke evacuation pipes;

The exposed parts of the smoke evacuation pipes must not be in contact with wood or other flammable substances. The extension of the flue must allow the expansion of thermic and the flue must prevent rainwater from entering.

⑴. Horizontal overhead: The advantages are fewer turns and low resistance; the disadvantages are poor heat dissipation indoors and high temperature in the computer room.

⑵. Installation in trenches: the advantage is good heat dissipation inside; the disadvantages are many turns and high resistance.

5. The unit's exhaust pipe has a high temperature. In order to prevent the operator from being burned and to reduce the increase in engine room temperature caused by radiant heat, it must be insulated. Heat-insulating and heat-resistant material can be wrapped with glass wool or aluminum silicate, can play the role of heat insulation and noise reduction.

3. Exhaust system installation:

1. The working definition of the exhaust systemt of diesel generator set means that after installing the diesel generator set, engine room, the exhaust system is discharged by the engine. The air port is connected to the engine room exhaust duct.

2. The diesel generator set exhaust system includes the standard muffler, bellows, flange, elbow, gasket and engine room connected to the exhaust pipe outside the engine room.

The exhaust system should reduce the number of elbows and shorten the overall length of the exhaust pipe as much as possible, otherwise the exhaust pipe pressure of the unit will increase. This will cause the unit to lose excessive power, affecting its normal operation and shortening its normal lifespan. The exhaust pipe diameter specified in the technical data of the diesel generator set is generally based on a total length of the exhaust pipeof 6 m and on the installation of at most one elbow and one silencer. When the exhaust system exceeds the length and number of elbows specified during actual installation, the diameter of the exhaust pipe should be increased appropriately. The extent of the increase depends on the total length of the exhaust pipe and the number of bends. The first section of piping coming from the unit's compressor exhaust manifold must contain a flexible bellows section. This corrugated pipe was provided to the customer. The second section of the exhaust pipe must be elastically supported to avoid unreasonable installation of the exhaust pipe or unit failure. Additional lateral stresses and compressive stresses caused by the relative displacement of the exhaust system due to thermal effects are added to the unit. All support mechanisms and suspension devices of the exhaust pipe must haveor a certain degree of elasticity. When there is more than one unit in the engine room, remember that the exhaust system for each unit must be designed and installed independently. It is never allowed to allow different units to share an exhaust pipe to avoid abnormal fluctuations caused by different exhaust pressures of different units when the unit is in operation, increase the exhaust pressure and prevent Smoke and exhaust gases flow back through the shared pipe. affecting the normal power output of the unit may even cause damage to the unit.

4. Installation of electrical systems:

1. Cable Laying Methods

Cable laying methods include direct burial, use of cable trenches and laying along walls. Wait a few moments. .

2. Selection of the cable routing path

When selecting the cable routing pathlaying cables, the following principles should be considered:

⑴ The power path is the. the shortest and has the fewest turns;

⑵. Make cables less susceptible to damage caused by mechanical, chemical and earth current factors

⑶ Heat dissipation conditions should be good; /p>

⑷. Try to avoid crossing other pipelines;

⑸ Avoid planned areas where ground must be excavated.

3. General requirements for cable laying

When laying cables, you must comply with the planning and design requirements of the relevant technical regulations.

⑴ If the installation conditions allow it, a margin of 1.5%~2% can be considered for the length of the cable.

1. Preparations before installing the unit:

1. Transportation of the unit:

During transportation, care should be taken to attach the lifting ropes to the appropriate locations; . positiveon, lift it up gently and put it down gently. Once the unit is transported to its destination, it should be stored in a warehouse as much as possible. If there is no warehouse and it must be stored in the open, the fuel tank must be elevated to prevent it from getting soaked. rain. The tank should be covered with a waterproof tent to prevent it from being exposed to sun and rain.

Due to the large size and heavy weight of the unit, the transportation route should be arranged before installation, and a transportation port should be reserved in the engine room. Once the unit is installed, the walls must be arranged. be repaired and doors and windows installed.

2. Unpacking;

Before unpacking, you must first remove the dust and check the box for damage. Check the box number and quantity, and do not damage the device when unpacking. Unpacking orderis to fold the top panel first, then remove the side panels. After unpacking, the following work must be carried out:

①. Check all units and accessories according to the unit list and packing list;

② Check if the main dimensions of the unit; and accessories conform to the drawings. ;

③. Check whether the unit and accessories are damaged or rusty

④ If the unit cannot be installed in time after inspection; Disassembled parts must be surface finished. Reapply rust-inhibiting oil for proper protection. Do not rotate the transmission part and the lubricating part of the unit before removing the anti-rust oil. If the anti-rust oil was removed after inspection, it must be reapplied after the inspection.

⑤. Pay attention to the safety of the device after unpacking it, and it must be level. Once installed, the bride and the various interfaces must be covered and wrapped to prevent rain and dust from entering.

3. Line positioning;

Delineate the unit installation based on the relationship dimensions between the unit and the center of the wall or column, and between the unit and the marked unit . on the unit floor plan. The vertical and horizontal reference lines of the location. The allowable gap between the center of the unit and the center of the wall or column is 20mm, and the allowable gap between units is 10mm.

4. Check equipment for installation;

Check equipment, understand design content and construction drawings, prepare required materials according to design drawings, and deliver materials in sequence. according to construction site People.

If there are no design drawings, you must refer to the instructions and determine the size andthe location of the civil construction plan according to the purpose and equipment installation requirements, taking into account the water source, power supply. conditions of supply, maintenance and use, and establish a plan for the implementation of the units.

5. Prepare lifting equipment and installation tools;

2. Installing the unit:

1. Measure the foundation and the vertical and horizontal center lines of. unity;

Before the unit is in place, the vertical and horizontal center lines of the foundation and the unit as well as the positioning line of the shock absorber must be drawn according to the layout drawing ".

2. Raise the unit;

When lifting, a steel cable of sufficient strength should be used at the lifting position of the unit. It should not be placed on the tree. This should also prevent damage to the oil pipe and dial. SouleOpen the unit, align it with the center line of the foundation and shock absorber, and level the unit.

3. Level the machine;

Use the horns to level the machine. Installation accuracy is 0.1 mm per meter in horizontal longitudinal and transverse deviations. There should be no gaps between the iron and the base of the machine to ensure uniform stress.

4. Installation of smoke evacuation pipes;

The exposed parts of the smoke evacuation pipes must not be in contact with wood or other flammable substances. The flue extension must allow for thermal expansion and the flue must prevent rainwater from entering.

⑴. Horizontal overhead: The advantages are fewer turns and low resistance; the disadvantages are poor heat dissipation inside and high temperature in the roomformat.

⑵. Installation in trenches: the advantage is good heat dissipation inside; the disadvantages are many turns and high resistance.

5. The unit's exhaust pipe has a high temperature. In order to prevent the operator from being burned and to reduce the increase in engine room temperature caused by radiant heat, it must be insulated. Heat-insulating and heat-resistant material can be wrapped with glass wool or aluminum silicate, can play the role of heat insulation and noise reduction.

3. Exhaust system installation:

1. The working definition of diesel generator set exhaust system means that after the diesel generator set is installed, engine room, the exhaust system is discharged by the engine. The air port is connected to the engine room exhaust duct.

2. The exhaust system of the electric groupdiesel engine includes the standard muffler, bellows, flange, elbow, gasket and engine room connected to the exhaust pipe outside the engine room.

The exhaust system should reduce the number of elbows and shorten the overall length of the exhaust pipe as much as possible, otherwise the exhaust pipe pressure of the unit will increase. This will cause the device to lose excessive power, affecting the normal operation of the unit and reducing the normal life of the unit. The exhaust pipe diameter specified in the technical data of the diesel generator set is generally based on a total exhaust pipe length of 6 m and the installation of at most one elbow and one silencer. When the exhaust system exceeds the length and number of elbows specified during actual installation, the diameter of the exhaust pipe should be increased appropriately. The magnitude ofthe increase depends on the total length of the exhaust pipe and the number of bends. The first section of piping coming from the unit's compressor exhaust manifold must contain a flexible bellows section. The bellows has been supplied to the customer. The second section of the exhaust pipe must be elastically supported to avoid unreasonable installation of the exhaust pipe or additional lateral stresses and strains caused by relative displacement of the exhaust system due to thermal effects when the unit is in operation. functioning. Compressive stress is added to the unit and all support mechanisms and suspension devices of the exhaust pipe must have a certain degree of elasticity. When there is more than one unit in the engine room, remember that the exhaust system for each unit must be designed and installed independently. It is never permitted to allow different unities to share an exhaust pipe to avoid abnormal fluctuations caused by different exhaust pressures of different units when the unit is in operation, increase the exhaust pressure and prevent fumes and exhaust gases from flowing back to through the shared pipe. affecting the normal power output of the unit may even cause damage to the unit.

4. Installation of electrical systems:

1. Cable Laying Methods

Cable laying methods include direct burial, use of cable trenches and laying along walls. Wait a few moments. .

2. Selection of cable laying path

When selecting the cable laying path, the following principles should be considered:

⑴ The power path is the. the shortest and has the fewest turns;

⑵. Make cables less susceptible to damage caused by mechanical, chemical factorsques and earth current

⑶ The heat dissipation conditions must be good; /p>

⑷. Try to avoid crossing other pipelines;

⑸ Avoid planned areas where ground must be excavated.

3. General requirements for cable laying

When laying cables, you must comply with the planning and design requirements of the relevant technical regulations.

⑴ If the installation conditions allow it, a margin of 1.5%~2% can be considered for the length of the cable.

  • Popular Focus
  • Where is the cheapest battery wholesale?

    Where is the cheapest battery wholesale in Tangxia, Sanyuanli, Baiyun District? There is an enterprise specializing in the independent production of electric vehicles in Tangxia, Sanyuanli, Baiyun District, Baiyun Sanyuanli Avenue, Baiyun Sanyuanli Street
    08-02
  • Understanding 18650 Voltage: A Comprehensive Guide to Lithium-Ion Battery Power

    Lithium-ion batteries have become the backbone of modern portable electronics, providing the energy needed for everything from smartphones to electric vehicles. Among the various types of lithium-ion batteries, the 18650 battery stands out as a popular ch
    08-27
  • What are the materials of the negative electrodes of lithium batteries?

    What are the materials of the negative electrodes of lithium batteries? The main commercial applications of lithium batteries include graphite, which is a sheet of copper used to guide current and which does not react. another safe
    08-02
  • The difference between 18500 and 26500 batteries

    What is the difference between 18500 and 26500 batteries? The answer above is 18650. The person asking the question should ask what is the difference between 18505 and 26500 batteries. In the case of Fuant ER1
    08-02
  • What does 3.7V 80mAh written on a lithium battery mean?

    What does 3.7V 80mAh written on a lithium battery mean? 3.7 V, 80 mA = 0.08 A, H means 1 hour, or 3600 seconds. Taken together, it is
    08-02
  • How long does a lithium battery (cell phone battery) last?

    How long does a lithium battery (cell phone battery) last? The lifespan of mobile phone batteries, under normal conditions of use and without serious impact, the lifespan set by the manufacturer must be 5 years.
    08-02
  • Will lithium batteries explode when charging?

    Will lithium batteries explode when charged? Will lithium batteries explode when charged? Lithium battery explosions usually occur during the charging process, because the negative electrode material of lithium batteries is graphite or other carbon materi
    08-02
  • Parameters of lgdas31865 lithium battery

    Parameters of lgdas31865 lithium battery The parameters of lgdas31865 lithium battery are as follows: LGDAS31865 is a model 18650 lithium battery with a capacity of
    08-02
  • What are the main components of lithium battery electrolyte?

    What are the main components of lithium battery electrolyte? The composition of lithium battery electrolyte is shown below. 1. Ethylene carbonate: molecular formula C3H4O3. Colorless transparent liquid (>35℃), room temperature
    08-02
  • Who are the lithium battery manufacturers in Shandong?

    What are the lithium battery manufacturers in Shandong? Shandong Shengyang Power Supply Co., Ltd. and Shandong Weineng Environmental Protection Power Technology Co., Ltd. 1. Shandong Shengyang Power Supply Co., Ltd. is located in Shengyang, Qufu City.
    08-02
  • Types of drone batteries available in 2024

    Part 1. Types of drone batteries available in 2024In 2024, drone batteries have advanced significantly, offering a range of options to cater to various needs in
    07-30
  • How long does it take to charge 26650 battery?

    How long does it take to charge a 26650 battery? The charging time for a 26650 battery is generally between 3 and 6 hours, but the precise time depends on the power of the charger and the capacity of the battery. in general
    08-02
  • For what?Sure, here's an article based on the phrase "For what?

    The simple yet profound question, "For what?" often serves as a gateway to deeper reflections on purpose and intention. It is a query that invites us to delve into the reasons behind actions, decisions, and circumstances that shape our lives and the wor
    08-02
  • Choosing the Right Cart Battery

    This comprehensive guide will walk you through everything you need about cart batteries, from understanding different types to making an informed purchase decision.
    08-02
  • 30mAh~500mAh 3.7 V Li-ion Battery

    Welcome to Ufine's collection of 3.7V lithium-ion batteries ranging from 30mAh to 500mAh. Explore a diverse range of compact and lightweight batteries suitable for various electronic devices,
    08-02
  • Here are 10 essential facts about drone batteries for 2024.

    10 Key Facts About Drone Battery for 2024 In 2024, drone batteries have advanced significantly, offering a range of options to cater to various needs in the consumer, commercial, and industrial sectors. Below are the primary types of drone batteries avai
    08-02
  • Could you please explain the difference among IMR, ICR, INR, and IFR 18650 batteries?

    What is the Difference Between IMR, ICR, INR, and IFR 18650 Battery?In 18650 batteries, discerning the differences among IMR, ICR, INR, and IFR types is fundamental for tailored and efficient battery usage. These distinct
    08-02
  • Safety considerations for cart batteries

    Selecting the ideal cart battery is crucial for ensuring optimal performance and longevity of your electric vehicle or vaping device. This comprehensive guide w
    08-01