There are two types of diesel generator transmission link basics. One is a single link, that is, the output pulley of the diesel engine and the power input pulley of the generator are driven by a belt. There is no requirement regarding the center height of the. diesel engine generator shaft. Both bases should be as small as a triangular iron base bracket for ladders. The transmission linkage of large diesel generators uses coaxial couplings, so the center height from the base to the machine shaft should be strictly measured, and then the chassis is prepared.
How much does it cost to dismantle a wind turbine base?
The wind turbine base is an important part of the wind turbine. It supports the weight of all the wind. At the same time, it must also resist the enormous force brought by the wind. Therefore, the design and structure of the wind turbine baseare not very important.
Design points
The design points of the wind turbine base mainly include the following aspects:
1. Load capacity: The base of the wind turbine must support the load. all wind energy The weight of the generator must also withstand the enormous force brought by the wind. Therefore, the bearing capacity of the base must be strong enough.
2. Stability: The base of the wind turbine must have good stability to ensure that the entire wind turbine will not tilt or collapse under the action of the wind.
3. Durability: The wind turbine base should have good durability to ensure that it will not be damaged or deformed during long-term use.
Structural characteristics
The structural characteristics of the wind turbine base mainly include the following aspects:
1. Base part: The base part of the wind turbine basee. is usually It is cast in concrete to ensure sufficient bearing capacity and stability.
2. Support structure: The support structure of the wind turbine base is usually made of steel or concrete to ensure sufficient strength and stability.
3. Connection part: The connection part of the wind turbine base is usually bolted or welded to ensure sufficient connection strength and stability.
Application scenario analysis of wind turbine base
Wind turbine base is mainly used in wind farms. Its main function is to support the wind turbine and resist the force of the wind. The application scenarios of wind turbine bases mainly include the following aspects:
1. Lowland areas: Lowland areas generally have less wind, so taller wind turbines are required to achieve sufficient energy production. In this case, the basisof the wind turbine must have sufficient bearing capacity and stability to ensure the safe operation of the entire wind turbine.
2. Mountainous areas: Mountainous areas generally have stronger winds, so weaker wind turbines are required to achieve sufficient electricity generation. In this case, the wind turbine base must have sufficient stability and durability to ensure that the entire wind turbine will not tilt or collapse under the action of strong winds.
3. Offshore wind farms: Offshore wind farms are generally The strength is relatively large and must also resist the impact of waves. In this case, the wind turbine base must have sufficient durability and stability to ensure that the entire wind turbine will not tilt or collapse under wave action.
The operating steps of the wind turbine base
The operating stepsment of the wind turbine base mainly includes the following aspects:
1. Building the Foundation: First, this must be done. Foundation construction includes digging foundation pits, constructing formwork, pouring concrete and other steps.
2. Install the support structure: After the foundation construction is completed, the support structure must be installed, including support columns, support rings and other steel or concrete parts.
3. Install the connecting part: After the support structure is installed, the connecting part needs to be installed, including steps such as bolted connections or welded connections.
4. Install the wind turbine: After the connection part is installed, the wind turbine needs to be installed and connected to the base.
5. Debugging and testing: After the installation is completed, the entire wind turbine needs to be debuggedt tested to ensure normal operation.
The cost of dismantling the base of a wind turbine is about 250 yuan/kw. According to relevant public information, the cost of dismantling a wind turbine base is 150-200 yuan/kw, the transportation cost is also about 130 yuan/kw, and the dismantling cost is 20 yuan/kw .