When covering the KEMP table tennis floor, the cement floor must be flat and properly waterproofed. The surface of the base coat must be free of pits and cracks. No person should be able to enter or be put under pressure during the interview. of the base layer.
The installation method can use a unique double-sided seamless welding process to make each floor joint stronger and less likely to deform, making site rewinding more flexible.
1) Maintenance methods after laying the floor but before use
1 Clean the dust on the floor surface, etc.
2. Remove the protective wax and other stains on the floor surface and use a water suction machine to absorb the sewage.
3. Rinse with clean water and dry.
4. Apply one to two coats of high-strength facial wax as needed.
(2) Cleaning methodsage and daily maintenance
1. Daily maintenance: Use a 90% dry mop to clean the floor; use a vacuum cleaner to vacuum. Dip a clean mop in a cleaning product diluted in a certain proportion for cleaning.
2. Monthly Maintenance: Plastic floors are typically waxed and maintained once a month.