1. After turning on the power key, press the "Manual" button on the module to start it directly.
2. Once the generator set starts successfully and operates normally.
3. At the same time, the automation module also enters the self-test state.
4. It will automatically enter the acceleration state.
5. Once the speed increase is successful, the Hunan generator will enter automatic shutdown and grid connection according to the module display.