1. Once the unit is in position, adjust the anchor screws so that the wheels lift off the ground.
2. Check electrical components to ensure they are not loose or damaged.
3. Check all parts and screws to make sure they are not loose or damaged.
4. Check the direction of both sets of winding needles to confirm that they are intact and free of interference.
5. After confirming that the mechanical and electrical components are correct, connect the air source and the power supply in turn, and adjust the air pressure.
6. Set working parameters and perform dry run. Confirm that the action is correct.